Skip to content

Methodology · AU-BIZ-006

How the Contractor Day Rate Calculator works

This page documents how the Contractor Day Rate Calculator produces its figures: the engines and formulas it runs, the rule packs it reads statutory values from, the official documents those packs cite, and how the engines are verified. Official sources were last retrieved on .

Engines and formulas

  • E19 · Contractor economics engine

    Billable capacity from weekdays minus leave, holidays and non-billable days times utilisation; day rate covers income, super replacement, overheads and the chosen margin. GST is quoted on top and never treated as revenue.

    Registered formulas: §12.16 capacity

  • E20 · Business arithmetic engine

    GST arithmetic per §13.18 with explicit rounding levels and largest-remainder allocation so invoice lines always reconcile to totals.

    Registered formulas: F-GST-001 · F-GST-002

Rule packs

Statutory values come only from versioned, hash-verified rule packs citing official sources. Current status of the packs this calculator can use:

  • au-gst-standardactive · v0.1.0

Verification

Engines carry boundary tests at every bracket edge, property-based tests, reconciliation invariants and, where official worked examples exist, tests that reproduce them exactly. The full source register is on the sources page.

Open the calculator